DGX SuperPOD — not a single server but a blueprint for a whole supercomputer: how many racks, which DGX systems, which networks, what storage, power and management. NVIDIA builds the same kind of clusters for its own development work and validates software on them first, then publishes the reference architecture as a document with precise requirements.
Scalable unit — SU
The cluster is assembled from repeating blocks — scalable units (SU). An SU contains DGX systems, the compute network and part of the management hardware. The composition of a unit changes from generation to generation, so check the current NVIDIA document:
| GPU generation | SU composition | Note |
|---|---|---|
| Hopper | 32 DGX H100 systems — 256 GPUs | in the documentation example a rack consumes more than 40 kW |
| Blackwell | 32 DGX B200 systems — 256 GPUs | in the documentation example a rack consumes more than 25 kW |
| Blackwell Ultra | 64 DGX B300 systems | MGX racks powered via a DC busbar, more than 50 kW per rack |
Fully validated configurations start at two to four SUs (for DGX B200 — four SUs, that is 128 nodes and 1,024 GPUs; for DGX B300 — four SUs and 256 nodes), and larger configurations are discussed with NVIDIA: in the documentation tables the cluster scales up to 64 SUs — 2,048 DGX B200 nodes and 16,384 GPUs.
Networks, storage and management
Traffic is split across independent fabrics: compute, a separate one for storage, and Ethernet for management. In the DGX B200 reference architecture the compute fabric is InfiniBand NDR at 400 Gbit/s, in the DGX B300 reference architecture it is Ethernet Spectrum-X (two 400 GbE ports per GPU in two planes). The storage fabric is built on InfiniBand or on Ethernet with RoCE (RDMA over Ethernet); I/O per DGX node must exceed 40 GB/s. Storage is supplied by NVIDIA-certified partners.
- compute fabric — InfiniBand for DGX B200, Ethernet Spectrum-X for DGX B300
- storage fabric — separate, so that backups and data traffic do not interfere with training
- management — Ethernet with management servers and NVIDIA software (Mission Control in the B300 reference architecture)
Why companies use it
The ready-made architecture saves months of design work: there is no need to pick servers or work out the network topology and cooling — you take a validated configuration. In the documentation example a rack with DGX B200 consumes more than 25 kW and a rack with DGX B300 more than 50 kW, so the machine room for a SuperPOD is designed with this power and cooling density in mind. The configuration is intended for a single organisation with several users.
Sources
the term is written from these pages- NVIDIA DGX SuperPOD: Reference Architecture Featuring NVIDIA DGX B200docs.nvidia.com/dgx-superpod/reference-architecture-scalable-infrastructure-b200/latest/(opens in a new tab)
- NVIDIA DGX SuperPOD: Reference Architecture (DGX B300)docs.nvidia.com/dgx-superpod/reference-architecture/scalable-infrastructure-b300/latest/abstract.html(opens in a new tab)
- NVIDIA DGX SuperPODnvidia.com/en-us/data-center/dgx-superpod/(opens in a new tab)