What IT project management is and how it works
A project is temporary work for a unique result: implementing a CRM, moving to the cloud, delivering a release. Project management is the application of knowledge, skills, tools and techniques to project activities to meet the project’s requirements (the definition of PMI, the Project Management Institute).
A project differs from operational work in its uniqueness. Operational work is processes that run continuously: user support, backups, updates. A project ends when the result has been achieved. ISO 21500:2021 defines the concepts of project, programme and portfolio: a programme is several related projects managed together for a common benefit; a portfolio is all the projects and programmes of an organisation, selected to serve its goals.
| Aspect | Project | Operational work |
|---|---|---|
| Duration | has a start and an end: implementing a CRM in 6 months | continuous: daily support of the same CRM |
| Result | unique: no such CRM existed before | repetitive: the same tickets and reports |
| Team | assembled for the project and disbanded | permanent roles with no end date |
| How success is measured | delivered on time, on budget and within the specified scope | stability: availability and response time |
A project has four interdependent constraints: scope, schedule, cost and quality. Moving one without the others never works. If the customer asks to shorten a CRM implementation from 6 to 4 months, you have to cut the scope — defer some of the features — or add people and money. Quality is never the buffer: less testing means not savings but defects that users will find.
A project and a product are different things with different ends. A project ends with acceptance of the result; after that the product lives in operation for years, until decommissioning. Project success is measured by delivery on time and on budget, product success by the value for users.
Several roles are responsible for the result; each one is covered in detail in the section “Roles and responsibility”:
- sponsor (customer) — owns the money and the goals; accepts the result;
- project manager — plans, coordinates and reports; is responsible for the schedule, the budget and the scope;
- Product Owner — decides what the team does and in what order;
- team — the specialists who do the work;
- stakeholders — everyone the result affects: users, contractors, the operations team.
The life cycle from idea to operation
Projects share the same phases and differ in how deeply each one is worked through; the kinds of life cycle models are covered in detail in the section “Life cycle models”. GOST R 59793-2021 describes the same stages in different words: requirements definition, concept development, technical specification, preliminary design, detailed design, working documentation, commissioning and maintenance. ISO/IEC/IEEE 12207 covers the full software life cycle, including operation and decommissioning.
- Business case — why the project exists: the business goal, the expected benefit, a preliminary estimate.
- Initiation — a project manager is appointed, the charter and the technical specification are approved; the project receives money and authority.
- Planning — scope, schedule, budget, risks and the communication plan.
- Execution and control — the team does the work; the manager keeps track of the schedule, the budget and changes.
- Acceptance and handover — the customer checks the result against the acceptance criteria and accepts it.
- Operation — the product runs outside the project: maintenance, further development, decommissioning.
The project ends at acceptance — after that the result lives a life of its own. Decisions about the product, operation and technical debt continue to be made without the project team. So it pays to decide at the planning stage who will maintain the system after handover.
How it differs from related disciplines
| Discipline | What is at the centre | Who is responsible | When it ends |
|---|---|---|---|
| Project management | a unique result within a given scope, schedule and budget | project manager | with acceptance of the result |
| Product management | the value of the product: user needs and development | product manager | with the product’s decommissioning |
| IT service management (ITSM) | stable services: incidents, requests, changes | the operations team | it never ends while the service lives |
| Programme management | related projects with a common result | programme manager | when the programme goals are achieved |
The boundary is simple: project management ends with acceptance, while the product, the service and the programme live longer — they have different roles and different criteria of success.
What you need to know in advance
No prior knowledge is required: the section starts from zero. Related references will come in handy once you reach practice: how the quality of the result is checked — “Test design”; how a system is described — “Software architecture”; how built code reaches operation — “CI/CD”.
Section sources
the section is written from these pages- ISO 21500:2021 Project, programme and portfolio management — Context and conceptsiso.org/standard/75704.html(opens in a new tab)
- What is Project Management?pmi.org/about/what-is-project-management(opens in a new tab)
- ISO/IEC/IEEE 12207:2026 Systems and software engineering — Software life cycle processesiso.org/standard/90219.html(opens in a new tab)
- Стандарты, вступившие в силу в апреле (часть 2)gostinfo.ru/News/Details/1496(opens in a new tab)