Bookmarks

Postmortem

A document that captures an incident after the outage is over: what happened, why, and which measures will keep it from happening again. The review is conducted without looking for someone to blame.

Also: postmortem review, blameless postmortem, incident review, post-mortem

checked 18 Nov

All terms

The outage has died down and the service is back up — the perfect moment to write down what happened. Without such a document the details fade from memory quickly, knowledge stays with three people in a chat, and the next outage happens for the same reason. That is why significant incidents are followed by a postmortem: an honest review that runs from the cause to the measures taken.

What’s inside

The template from the Google SRE book sets out a standard structure: each section answers its own question.

SectionWhat it answers
Headerwhen it happened and how long it lasted, who the authors are, the status of the document
Impactwhich services and how many users were affected, how many requests or how much money was lost
Causeswhat the root cause was and what triggered the failure
Timelinehow events unfolded: from the first alerts to full recovery, with timestamps
What went well and what didn’twhat worked well, what didn’t, and where it was plain luck
Actionsa list of measures to keep the outage from recurring, each with an owner and a ticket number

Without looking for someone to blame

The guiding principle of review culture is blameless: the question is not “who broke it” but “what let it break” — weak monitoring, a manual procedure, a missing limit. Everyone involved is assumed to have acted in good faith with the information they had. If mistakes are punished, problems start being hushed up and reviews lose their point. The idea came from medicine and aviation, where reviewing errors saves lives; in IT it was popularised by the book Site Reliability Engineering, published by Google engineers in 2016.

How it’s done

When to start the review is agreed in advance: the criteria — noticeable downtime, a long recovery, a monitoring outage — are fixed before the incident, not after. Senior engineers check the draft: whether enough impact data has been gathered and whether the cause has been explored deeply enough; the document is then published in a shared incident repository. The outcome is not “be more careful” but tickets in a tracker, each with an owner and a deadline: fix the monitoring, automate the manual step, add a test or a limit.

Sources

the term is written from these pages

Verified 18 Nov

Not to be confused with

what it is mixed up with and how it differs

  • incident management

    Incident management is the process during the outage: detect it, limit the impact, restore service. A postmortem is the review after the service has already been fixed.

In depth in the references

where the topic is covered in detail