Backups save the data, but not the service: after a data centre fire, a ransomware attack or the failure of a site, servers, network and applications have to be brought up again — quickly. Disaster recovery describes how an organisation does this by plan: which systems to restore first, where to switch over to and who is responsible for what.
What a DR plan includes
- a list of critical systems and the recovery order: what to bring up first
- the RTO and RPO targets for each system — how quickly to restore it and how much data may be lost
- a recovery site and the way of switching over to it
- roles and the notification order: who declares the disaster, who carries out the recovery and who informs the users
- regular drills that run the whole plan, rather than only keeping it on file
Recovery sites: hot, warm, cold
| Site | What is ready in advance | When it is ready to work |
|---|---|---|
| hot | a full copy of the infrastructure, with data replicated continuously | quickly: the site is already running with up-to-date data |
| warm | hardware and communication links; data is loaded from backups | from several hours to several days |
| cold | premises, power and cooling; hardware and links are set up after the disaster | from several days to weeks |
The hotter the site, the more expensive it is, so the choice follows the required RTO. An online shop with a 15-minute RTO keeps a hot site in another region, while an internal reporting service with a one-day RTO gets by with a warm one. In the cloud, another region serves as the recovery site.
How readiness is tested
The plan is considered workable only after drills: from restoring a single system from backups to a full site switchover. The drills measure the actual recovery time and data loss and compare them with the RTO and RPO — the gaps become tasks for the team.