OKR connects what a company wants to achieve with verifiable signs that it has achieved it: the objective answers the question “where are we going”, the key results — “how will we know we have got there”. The approach was devised by Andy Grove at Intel, who called it iMBO; the name OKR came from John Doerr, who showed the method to Google’s founders in 1999.
What OKR consists of
| Part | Requirements | Example |
|---|---|---|
| Objective | one per level, qualitative, specific and inspiring, with no numbers | make support so good that customers recommend it |
| Key results | 3–5 per objective, measurable and verifiable: either done or not done, with no “grey area” | raise the share of “excellent” support ratings from 61% to 75% |
| Initiatives | projects and tasks that move the results; not part of the OKR itself | launch a knowledge base and a first-line chatbot |
How the cycle works
- the cycle is short — usually a quarter: an objective may live longer than a year, while the results are refreshed every cycle;
- levels are linked: a team derives its OKRs from the department’s OKRs, and those from the company’s objectives;
- progress is checked and discussed during the cycle, and at the end each result is scored; Google gives each result a score from 0.0 to 1.0 and averages it per objective;
- OKRs are ambitious: if the score is consistently 1.0, the objective was not bold enough.
What OKR does not cover
OKRs are not a list of all the team’s tasks: routine work (“business as usual”) stays in plans and the backlog, while OKRs describe the desired changes. They are not tied to pay and bonuses — one of the differences from Drucker’s MBO — otherwise teams lower the bar. And they are not KPIs: a KPI measures the health of a process, while key results are the changes to be achieved within a cycle.
Sources
the term is written from these pagesVerified 9 Nov