Bookmarks

BRD — business requirements document

A description of a project’s business goals and requirements: why it is initiated, which business problem it solves and how its success will be measured.

Also: business requirements, project business requirements document

checked 9 Nov

All terms

A BRD captures requirements at the highest level of all — the business level: why the company is taking on the project, which problem it solves and what the company will gain from it. It contains no technical decisions. The document is usually prepared by a business analyst together with the customer and the project sponsor, and it then serves as the basis for the SRS, the PRD or the technical specification.

What it typically contains

SectionWhat it describes
Goals and justificationthe business problem or opportunity and the expected benefit: money, time, service quality
Project scopewhat is included in the work and what remains outside it
Business requirementswhat the business needs, without implementation details
Stakeholderswho influences the project and whom it affects, their roles and interests
Success criteriahow the result will be measured: metrics, deadlines, budget
Constraints and assumptionsdeadlines, budget, laws, existing systems the project will have to build on

Example

A pharmacy chain commissions a stock control system. The business requirement in the BRD reads: “cut the share of out-of-stock items from 8% to 3% by the end of the year, on a budget of no more than RUB 20 million”. How exactly this is achieved — a new application, integration with suppliers, process changes — is not decided in the document; these questions go to the SRS and the design decisions. What the customer does get from the BRD is a metric against which the success of the project can be checked.

BRD, SRS and the technical specification

A Guide to the Business Analysis Body of Knowledge (BABOK), published by the IIBA, defines business requirements as “a representation of goals, objectives and outcomes that describes why a change is undertaken and how its success will be measured”. There is no single standard for the document itself: each company decides on the set of sections for itself. The BRD answers the question “why”, the SRS — “what the system must do”, and the technical specification is a contractual document covering the system as a whole.

Sources

the term is written from these pages

Verified 9 Nov

Not to be confused with

what it is mixed up with and how it differs

  • SRSsoftware requirements specification

    The SRS details the requirements for the software itself — functions, interfaces, quality attributes; the BRD covers the business and goals level.

  • PRDproduct requirements document

    The PRD is written by a product manager about what is being built and for whom; the BRD is a document of the customer and the sponsor, about the benefit for the business.

  • ТЗtechnical specification

    The technical specification is a contractual document listing the scope of work and the acceptance procedure; the BRD merely records the goals and business requirements.

In depth in the references

where the topic is covered in detail