Bookmarks

ТЗ — technical specification

A document that records the customer’s requirements for a system: what it must do, under which conditions it must operate and what counts as the result.

Also: terms of reference, ToR

checked 9 Nov

All terms

The technical specification is the starting point of development: before the contract is signed, the customer and the contractor use it to agree on the system’s boundaries, the scope of work and the acceptance procedure. Under GOST 34.602-2020, the technical specification for an automated system is the document that defines the requirements and the procedure for creating the system; development and acceptance are carried out against it.

Structure under GOST 34.602-2020

GOST 34.602-2020 is an interstate standard for technical specifications for automated systems; it has been in force in Russia since 1 January 2022, replacing GOST 34.602-89. It defines the set of sections that is often taken as a basis even outside government contracts:

SectionWhat it describes
General informationsystem name, customer and developer, basis for the work
Purpose and goalswhy the system is created and what goals it is meant to achieve
Object characteristicshow the processes to be automated are organised
System requirementsgeneral technical requirements, functions, types of support
Development procedurehow and in what order the system is created
Control and acceptance procedurestages, testing, who accepts the result and how

How a technical specification differs from an SRS

A technical specification describes the system as a whole at the contract level: goals, boundaries, scope of work and acceptance. An SRS details the requirements for the software itself — functions, interfaces, quality attributes — usually following ISO/IEC/IEEE 29148. In GOST 34 projects, the customer approves the technical specification, while the development team more often writes the SRS as an internal document. In practice, a single specification may be replaced by a package: a BRD for the business, an SRS for the team and an SOW for the contract.

What to check before approval

  • Each function has acceptance criteria — exactly how it is verified that the function is done.
  • The boundaries are stated explicitly: what the system does and does not do, and what remains on the customer’s side.
  • The scope of work and the deadlines match the budget and the contract, not the other way round.
  • The terminology is consistent: key concepts are defined and disputed ones are recorded.

Sources

the term is written from these pages

Verified 9 Nov

Not to be confused with

what it is mixed up with and how it differs

  • SRSsoftware requirements specification

    The SRS describes the requirements for the software itself in detail; the technical specification is a contractual document covering the system as a whole: goals, boundaries, scope of work and acceptance.

In depth in the references

where the topic is covered in detail