PMBOK — Project Management Body of Knowledge

A PMI guide that brings together generally accepted project management practice: principles, domains and processes — from the charter to delivering the results.

Also: PMBOK Guide, Guide to the Project Management Body of Knowledge, project management body of knowledge

checked 9 Nov

All terms

The PMBOK is what PMI considers generally accepted project management practice: the vocabulary, processes and principles applicable to most projects most of the time. The PMBOK Guide is used to align terminology in contracts and procedures, to prepare for the PMP and CAPM exams and to build corporate project management methodologies.

The body of knowledge and the guide

The term stands for the entire body of project management knowledge, while the PMBOK Guide is the book in which PMI regularly publishes a snapshot of it. The first edition came out in 1996, and PMI has reissued the guide every few years since; as of November 2026 the current one is the eighth, published in November 2025.

How the editions are structured

EditionStructure
Sixth, 201749 processes in five process groups and ten knowledge areas; agile practices were included in the body of knowledge for the first time
Seventh, 202112 principles instead of knowledge areas and 8 performance domains
Eighth, November 20256 principles and 7 performance domains; process guidance returned as a reference, without prescriptions

The seventh edition replaced process logic with principles and domains: instead of “do this and that” — values and areas that keep the work under control. The eighth edition brought the processes back as a reference without cancelling the principles: the book can still be taken in parts rather than followed as an instruction.

How it is used

  • As a common language: the names of processes, artefacts and roles from the PMBOK are used in contracts and internal procedures.
  • As the basis for certification: the PMP exam draws on the PMBOK Guide and related PMI materials.
  • As the backbone of a corporate methodology: the PMBOK does not prescribe a method — the organisation itself decides what to take from the body of knowledge.

Sources

the term is written from these pages

Verified 9 Nov

Not to be confused with

what it is mixed up with and how it differs

  • PRINCE2 methodology

    PRINCE2 is a project management method with prescribed roles and stages, while the PMBOK is a body of knowledge and practices that is not prescriptive.

  • waterfall model

    The PMBOK does not set a life cycle: whether the approach is predictive, hybrid or adaptive is for the team to decide.