Gantt chart

A schedule view where the tasks of a project appear as bars along a time scale: deadlines, the duration of work and the links between them are all visible.

Also: Gantt diagram, Gantt bar chart

checked 9 Nov

All terms

A Gantt chart is the familiar picture of a project plan: a list of work on the left, a time scale across the top, and each job as a bar from start to finish. It shows what is going on now, what starts after what, and where the project risks missing its deadline.

What you see on the chart

ElementWhat it shows
Bara single task: when it starts and ends, how long it lasts
Time scalethe planning units — days to months, at the top or the bottom
Dependency arrowa link between tasks: the next one cannot start until the previous one is finished
Milestonea checkpoint with no duration — a release, acceptance, signing off a contract; drawn as a diamond
Bar fillthe share of work completed — the percentage done as of the current date
Resource rowwho does the task: an assignee or a team

Where the term comes from

The chart was devised and popularised around 1910–1915 by the American engineer Henry Gantt, and his name stuck in the title. Early charts were drawn by hand and redrawn with every change to the plan; today the chart is built into most project management tools, from Microsoft Project to Jira and OpenProject.

When it helps and when it gets in the way

The chart works well where the plan is known in advance and the dates are fixed: construction, an infrastructure migration, a project with contractual deadlines. For such a project it also serves as a report for management: one picture instead of a long table.

Trouble starts when the plan changes daily: bars have to be moved by hand, and the chart goes stale faster than it is updated. That is why in iterative development the plan for the sprint lives on a task board, and a Gantt chart is drawn for projects with a strong schedule or at the top level of the plan.

Sources

the term is written from these pages

Verified 9 Nov

Not to be confused with

what it is mixed up with and how it differs

  • WBSwork breakdown structure

    A WBS lists the work of a project as a hierarchy, with no dates or durations; a Gantt chart lays the same work out on a time scale and shows the links.

  • CPMcritical path method

    The critical path is the calculation of the longest chain of dependencies, which sets the project’s minimum duration; on a Gantt chart it is singled out separately.

  • roadmap

    A roadmap shows the major stages and goals of a product without task-level detail; a Gantt chart deals with specific work and dates.

In depth in the references

where the topic is covered in detail